Search result: JJG 184-2012 (JJG 184-2004 Older version)
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 184-2012 | English | 1039 |
Add to Cart
|
5 days [Need to translate]
|
Verification Regulation of Volume of Rail Tankers for Liquefied Gases
| Obsolete |
JJG 184-2012
|
JJG 184-2004 | English | RFQ |
ASK
|
3 days [Need to translate]
|
Locomotive odometer VRof
| |
JJG 184-2004
|
JJG 184-1993 | English | 639 |
Add to Cart
|
5 days [Need to translate]
|
Verification Regulation for the Volume of Liquefied Gass Railway Tank Car
| Obsolete |
JJG 184-1993
|
Standard ID | JJG 184-2012 (JJG184-2012) | Description (Translated English) | Verification Regulation of Volume of Rail Tankers for Liquefied Gases | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A52 | Classification of International Standard | 17.120 | Word Count Estimation | 26,233 | Older Standard (superseded by this standard) | JJG 184-1993 | Quoted Standard | JJF 1001; JJF 1009; GB/T 10478; TG/HY 105; OIML R80-1 | Adopted Standard | OIML R80-1, NEQ | Issuing agency(ies) | State Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to liquefied gas rail tankers initial verification, testing and use of follow-up checks. |
JJG 184-2012
Verification Regulation of Volume of Rail Tankers for Liquefied Gases
State verification procedures People's Republic of China
Liquefied gas tanker railroad Volume
Issued on. 2012-12-03
2013-06-03 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Liquefied gas tanker railroad Volume
Verification Regulation
uefiedGases
Replacing JJG 184-1993
Focal point. the National Technical Committee on Metering flow capacity
The main drafting units. National Railway Tank Car Volume metering station
Ministry of Railways Institute of Measurement Standards
Participated in the drafting. National Railway Tank Car Volume metering station sub-station in Xi'an
National Railway Tank Car Volume metering station sub-station in Jinzhou
This procedure flow capacity commissioned the National Technical Committee responsible for the interpretation of measurement
The main drafters of this procedure.
Shao Xuejun (National Railway Tank Car Volume metering station)
Fuqing Xi (MOR Standards and Metrology Institute)
Yan Feng-xia (National Railway Tank Car Volume metering station)
Drafters participate.
Ding Jianxing (National Railway Tank Car Volume metering station Xi'an sub-station)
Zhou Bao Long (National Railway Tank Car Volume metering station)
Wang Hongyu (National Railway Tank Car Volume metering station Jinzhou sub-station)
Chao (National Railway Tank Car Volume metering station Xi'an sub-station)
table of Contents
Introduction (Ⅱ)
1 Scope (1)
2. References (1)
3 Terms (1)
3.1 Tank volume (1)
3.2 Quasi maximum loading height (1)
Table 3.3 Volume (1)
Volume No. 3.4 (1)
3.5 Calibration Software (1)
4 Overview (1)
5 metering performance requirements (2)
6 General Requirements (2)
6.1 Appearance (2)
6.2 Safety Accessories (2)
7 control of measuring instruments (2)
7.1 General (2)
7.2 verification Conditions (2)
7.3 Verification Project (4)
7.4 Verification Methods (4)
7.5 Verification Results Processing (7)
7.6 test cycle (7)
The main railway tanker cars and the corresponding volume parameter table prefix number list in Appendix A liquefied gas (8)
Test records Table format Appendix B liquefied gas tanker railroad tank measurements (9)
Appendix C liquefied gas tanker railroad tank outside measurement test record table format (10)
Appendix D temperature correction formula (11)
Appendix E volume calculation formula (12)
Appendix F liquefied gas tanker rail capacity comparison test record sheet format (14)
Appendix G pressure correction equation (15)
Appendix H quasi maximum loading height calculation (16)
Appendix J liquefied gas tanker common rail shipment of medium density reference table (17)
Appendix K-page test certificate format (18)
Appendix L test results in the notice page format (20)
introduction
This procedure is JJF1002 "national verification procedures write rules", JJF1001 "universal metering and fixed term
Justice ", JJF1009" capacity metering Terms and Definitions ", JJF1059" Evaluation and Expression of Uncertainty in Measurement "as the basis and reference
Road and rail tankers exam International Organization of Legal Metrology (OIML) International Recommendation R80-1 "has a level measurement
Part 1. metrological and technical requirements, "the English version (Roadandrailtankerswithlevelgauging, Part 1.
MetrologicalandTechnicalRequirements), adopted some of these metrological and technical requirements, test side
France and other content, combined with the actual situation of China's railway liquefied gas tanker metrology, and for JJG 184-1993 "liquefaction
Railway Tank Car Volume of gas "has been revised. Compared with JJG 184-1993 version, in addition to editorial changes of this Regulation, the
The main technical changes are as follows.
--- Increased introduction, describes the basis for the revised procedures, the use of international recommendations, replaced the previous procedures
Release conditions;
--- According to the definition of procedures JJF1001 scope has been modified (see 1);
--- Increasing the reference document, the contents of references is an essential part of the procedure (see 2);
--- Increased terms of national regulations involved did not provide a definition of the term is given (see 3);
--- Through performance tests and measurement uncertainty evaluation, verification, railways liquefied gas Tank volume 70%
The above test results of the expanded uncertainty identified as. 4 × 10-3, k = 2 (geometric measurement); 2 × 10-3, k = 2 (capacity
Comparative Law) (see 5);
--- The common technical requirements and measurement are not directly related to the content deleted, added and modified directly with metering
Related content (see 6);
--- Verification method increases the capacity of comparative law, a corresponding increase in test conditions, test equipment of the method, the calibrated
Cheng and other content, geometric measurements of the test methods and test equipment adjustment has been made (see 7.4);
Effectively increases the car --- "Car gauge reading corrected for measurement" test project to make the measurement operation
Level meter reading (see 7.4.3);
--- Adds new liquefied gas tanker technical parameters of the railway in 1993 after domestic production, updating old models
Technical parameters, increasing the volume table number prefix (see Appendix A);
--- According to changes in test items and test methods, increasing the test record table format (see Appendix B, C, F);
--- Increasing the temperature of the modified formula (see Appendix D), the volume of the pressure correction formula by the body to the appendix (see Appendix G);
--- The volume is calculated by the body to the appendix. Existing models have oval head, therefore dished head
Volume calculation delete content, increase elliptical head volume calculation content; increase the computational volume tank attachment (see Annex E).
--- The "filling height calculation method" was changed to "quasi-maximum loading height computing" to modify the calculation method (see Appendix H);
--- Modify the common shipping medium density reference table (see Appendix J);
--- According to JJF1002 requirements, modify the page format in the test certificate (see Annex K), an increase of test results
Notice page format (see Annex L).
The initial version of JJG 184-1993 based procedures.
Railway Tank Car Volume verification procedures liquefied gas
1 Scope
The order applies to liquefied gas tanker railroad initial verification, use and subsequent verification check.
2. References
JJF1001 common measurement terms and definitions
JJF1009 capacity measurement terms and definitions
GB/T 10478 liquefied gas tanker railroad
TG/HY105 railway transportation of hazardous goods rules
OIMLR80-1 level measurement has road and rail tankers - Part 1. metrological and technical requirements (Road
andrailtankerswithlevelgauging, Part 1. MetrologicalandTechnicalRequirements)
For dated references, only the dated edition applies to this procedure; undated references,
The latest version (including any amendments) applies to this procedure.
3 Terms
JJF1001, JJF1009, GB/T 10478, OIMLR80-1 relating to the following terms and definitions apply to this
Procedures.
3.1 Tank volume totalcapacity
Under normal atmospheric pressure, the standard temperature (20 ℃) when the inner surface of the tank below the top horizontal section volume.
3.2 Quasi maximum loading height maximumpermissibleloadingheight
At reference conditions, liquefied gas rail tankers loaded media allowed the maximum level value.
3.3 volume table tankcapacitytable
Data table liquefied gas tanker rail level and the corresponding volume value.
3.4 Volume No. tankcapacitytablenumber
By a liquefied gas tanker rail cars to determine the volume table number, each number corresponding to a volume table of contents OK
Volume table.
3.5 test software verificationsoftware
Calculated according to the volume of liquefied gas tanker rail test data volume derived table or volume table number and a certificate print work
The computer program can.
4 Overview
Liquefied gas tanker both railway transport is also working measuring instruments. After verification, liquefied gas rail tankers
It can be used for trade settlement liquefied gas products.
Liquefied gas tanker ships from the railway tanks, undercarriage, bogie, brake, coupler and draft gear, plus handling devices, etc.
Composition, some have escort room. Tank by the head, cylinder, manholes and other components. Head is generally oval-shaped head; cylinder is
......
|